The first batch of our Air Source Heat Pump (ASHP) systems is loaded and ready for delivery to East Coast College in Great Yarmouth.
Air Source Heat Pumps provide an energy-efficient alternative to traditional heating systems, extracting heat from the outside air and using it to provide heating within a building.
The systems have been pre-assembled at our workshops in Risby, Suffolk, before being transported to site. Taking this approach allows more of the work to be completed within a controlled workshop environment, helping to improve efficiency and safety while reducing the amount of assembly required on site.
Pre-assembly also helps us provide clients with a more efficient and sustainable approach to delivering mechanical installations, with the systems prepared and ready for the next stage of installation when they arrive on site.